BSRIA launches Living Laboratory Innovation Challenge
BSRIA has launched the Living Laboratory Innovation Challenge, which is now open for entries. Reflecting its vision to create greener, smarter and more comfortable indoor environments, BSRIA is offering organisations the chance to utilise one of two floors of its head office space to design, install and commission an exemplar HVAC and lighting system, with the in-use performance monitored and displayed in real-time.
Interested parties should submit an outline of their proposed solution by Friday 29th March 2024. Once commissioned, BSRIA will then provide real-time in-use monitoring of the systems’ performance – including air quality, light levels and thermal comfort – with live reporting hosted on the BSRIA website. The case study can then be used by the stakeholders to promote their solution as a showcase for innovative and effective retrofit methods that support decarbonisation and good indoor environmental quality.
Proposed designs should prioritise sustainable innovation, with the inclusion of biophilic design encouraged, as well as comfort, productivity and integration with smart technologies. Meanwhile the solution should be cost-effective, taking maintenance and energy consumption into account.
“We are excited to invite stakeholders to submit an expression of interest in our Living Laboratory Innovation Challenge,” commented Tom Garrigan, Technical Director at BSRIA. “It is a unique opportunity to collaborate on the development of a truly cutting-edge office environment, whilst establishing in-use performance metrics and occupant behavioural patterns over an extended period of time, which will provide valuable insights for stakeholders in future retrofit projects.”
See article BSRIA Living Laboratory Innovation Challenge for detail information and for any questions or to submit your expression of interest, please visit https://www.bsria.com/uk/air_quality_hub/living_laboratory_innovation_challenge/
This article was issued via Press Release by BSRIA as 'BSRIA launches Living Laboratory Innovation Challenge' dated March 5, 2024 and on the BSRIA news and blog site as 'Living Laboratory Innovation Challenge.'
--BSRIA
[edit] Related articles on Designing Buildings
- Atlas building, Eindhoven University.
- Air pollution index.
- Air quality hub.
- At a glance - Indoor air quality.
- BSRIA articles.
- BSRIA Briefing 2023. Cleaner Air, Better Tomorrow
- BSRIA definitions.
- Bringing a breath of fresh air to the design of indoor environments.
- Coronavirus and force majeure.
- COVID-19 and mental health within construction firms.
- Ensuring good indoor air quality in buildings.
- Health effects of indoor air quality on children and young people.
- IMMUNE Building Standard.
- Indoor air quality.
- Indoor environmental quality.
- Open Innovation programme.
- Post occupancy evaluation of completed construction works.
- Soft landings.
- User experience UX.
- United Nations Economic Commission for Europe UNECE.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.